Student Accommodation
Purpose Built Student Accommodation (PBSA)
Client:
Urbanest
Location:
Battersea
454-bed PBSA scheme for Urbanest in a single block of G+31 storeys. With stunning views over the Battersea regeneration area, the student flats are supported with staff rooms, reception meeting rooms, an amenity lounge at level 1 and at rooftop (including an enclosed terrace). Construction started in May 2016 and completed in July 2018. The core was slipped, with the floors built around, standardised bathroom pods were deployed for efficiency and the building wrapped in a unitised façade system.
Pre-Manufactured Value (PMV) Estimator
PMV Low
PMV Medium
PMV High
Low Medium High
MMC Category
1
Pre-manufacturing (3D primary structural systems)
2
Pre-manufacturing (2D primary structural systems)
3
Pre-manufacturing components (Non-systemised primary structure)
4
Additive Manufacturing (Structural and non-structural)
5
Pre-manufacturing (Non-structural assemblies & sub-assemblies)
6
Traditional building product led site labour reduction / productivity improvements
7
Site process led site labour reduction / productivity / assurance improvments
Share
Case Study
Urbanest Vauxhall
Read our in-depth case study on Urbanest Vauxhall, our purpose built student accommodation.
Read Case Study

Key Stats

454
units

12726m2
overall GIFA

1st
highest brick-clad building in the UK

Related Projects
View more of our related projects.
View more of our related projects.
Download Our Latest Market Update
Get in touch
Call us on +44(0)203 931 0200
Message us

if you would like to talk to us or see how we may be able to help you

Our address

Cast
Black Bull Yard
24-28 Hatton Wall
London
EC1N 8JH

Get in Touch Visit our contact page
Get in touch to see how we can help you
Call us on +44(0)203 931 0200
Our address

Cast
Black Bull Yard
24-28 Hatton Wall
London
EC1N 8JH

Message us Tell us what you’re looking for and we’ll send you a tailored list of options asap.