MMC Categorisation

This definition framework is an output of the UK Government’s MHCLG Joint Industry Working Group on MMC which is tasked with improving stakeholder education and understanding of MMC with particular reference to enabling better access to mortgage finance, insurance and assurance.

The Pre-manufactured Value Estimator will assist public and private clients, contractors and manufacturers to align and meet our sector performance goals.

1
Cast
Pre-manufacturing (3D primary structural systems)
2
Cast
Pre-manufacturing (2D primary structural systems)
3
Cast
Pre-manufacturing components (Non-systemised primary structure)
4
Cast
Additive Manufacturing (Structural and non-structural)
5
Cast
Pre-manufacturing (Non-structural assemblies & sub-assemblies)
6
Cast
Traditional building product led site labour reduction / productivity improvements
7
Cast
Site process led site labour reduction / productivity / assurance improvments
1
Cast
Pre-manufacturing (3D primary structural systems)
2
Cast
Pre-manufacturing (2D primary structural systems)
3
Cast
Pre-manufacturing components (Non-systemised primary structure)
4
Cast
Additive Manufacturing (Structural and non-structural)
5
Cast
Pre-manufacturing (Non-structural assemblies & sub-assemblies)
6
Cast
Traditional building product led site labour reduction / productivity improvements
7
Cast
Site process led site labour reduction / productivity / assurance improvments
Optimising category by choice by RIBA timeframe
 
Donec scelerisque tortor eget vestibulum efficitur. Morbi vestibulum, dolor eget efficitur imperdiet.
Decision Making Timeframes
  • RIBA Stage
  • Category 1
  • Category 2
  • Category 3
  • Category 4
  • Category 5
  • Category 6
  • Category 7
Cast
Swipe Right
Understanding the pre-manufacturing spectrum
 
Donec scelerisque tortor eget vestibulum efficitur. Morbi vestibulum, dolor eget efficitur imperdiet.
Decision Making Timeframes
  • RIBA Stage
  • Full volumetric modules Including fitting out
  • Hybrid - panellised wall / floor systems - Steel, closed panels timber…
  • Panellised structural wall / floor systems - steel , closed panel timber, CLT
  • Pre-manufactured structure Composite cladding system
  • Pre-manufactured structure Timber / precast
  • DfMA Led ‘traditional’
  • ‘Traditional build’ Base line
Cast
Swipe Right
Pre-manufactured value examples

Maecenas fermentum lorem sit amet arcu sodales dapibus. Lorem ipsum dolor sit amet, consectetur adipiscing elit. Praesent vitae commodo neque. Nam eu dapibus ante. Nulla porttitor.

Download Our Latest Market Update
Get in touch
Call us on +44(0)203 931 0200
Message us

if you would like to talk to us or see how we may be able to help you

Our address

Cast
Black Bull Yard
24-28 Hatton Wall
London
EC1N 8JH

Get in Touch Visit our contact page
Get in touch to see how we can help you
Call us on +44(0)203 931 0200
Our address

Cast
Black Bull Yard
24-28 Hatton Wall
London
EC1N 8JH

Message us Tell us what you’re looking for and we’ll send you a tailored list of options asap.